A condo board showed me a reserve study with “painting” as a single line — and that one line is how repaints turn into special assessments Why treating painting as one line in a condo reserve fund study leads to special assessments — and how to separate the systems, get real scopes, and phase the work.… Continue reading
A condo board sent me three quotes for the same corridor repaint — the 40% price spread was everything the cheapest bid left out Three quotes for the same corridor repaint, 40% apart. The spread was everything the cheapest bid left out — prep, product, logistics, and paperwork.… Continue reading